Resources
Design Categories:
- Circulation & Paving
- Community Gardens
- Excavation
- Exterior Security
- General Grounds
- On-site Clean Power Generation & Battery Storage
- Parking Lots
- Pedestrian Circulation & Paving
- Planting
- Playgrounds
- Site Amenities
- Site Fences
- Site Lighting
- Site Utilities
- Stairs, Ramps & Railings
- Stormwater Piping & Drainage Structures
- Building Drainage
- Building Sewage System
- Domestic Hot Water (DHW) System
- Domestic Water System
- Geothermal & Ground Source Heat Pumps
- Natural Gas Piping
- Non-Residential Spaces Plumbing Fixtures
- Plumbing General
- Roof Tanks
- Underground Chilled Water Piping
- Underground Hydronic Piping
- Underground Natural Gas Piping
- Underground Water Piping
Underground Water Piping
Description
- Projects in this scope area include connection to city water mains and installation of fire hydrants, valves, and meters. The full, detailed scope of work for this project including any additional work areas will be updated here after alignment with project stakeholders through scoping and design activities. The professional engineer needs to submit an application to DEP for a new water connection.
Relevant Codes & Regulations
NYC Plumbing Code — Water Service Piping
Installation requirements for underground potable water piping
NYC DEP — Water Supply Regulations
Service connections, meters, and materials standards
EPA — Safe Drinking Water Act
Federal drinking water quality requirements
OSHA — Underground Utility Safety
Safety requirements for trenching and pipe installation