Your browser is out of date!

Update your browser to view this website correctly.

Update browser

Locker Rooms & Showers

Locker Rooms & Showers

Description

  • Projects in this scope area may include: installing new basins, faucets, medicine cabinets, safe (GFCI) outlets, lighting, electrical lines, and bathroom ventilation; installing new shower stall walls and doors and tile/equivalent material flooring and walls; installing new ADA (Americans with Disabilities Act) entry doors; and installing new metal lockers and benches. The full, detailed scope of work for this project including any additional work areas will be updated here after alignment with project stakeholders through scoping and design activities.  For lockers installed in community centers, specify lockers with visibility holes in the locker doors, and if locker door locking mechanisms are used include locks with a master key override. 

Baseline

  • Provide shower and locker room with ADA compliance. Replace all finishes and fixtures as needed.

Strategies

Optimize Performance, Operation & Maintenance of Buildings, Systems & Assets

Optimize Performance, Operation & Maintenance of Buildings, Systems & Assets

Ensure Accessibility & Inclusion

Ensure Accessibility & Inclusion

Commercial BathroomsCommunity CentersEntryways

Last Updated on May 15, 2025 at 11:38 am

Downloads and Data

Specifications

06 10 00 – Rough Carpentry

Download file

06 20 00 – Finish Carpentry

Download file

08 31 00 – Access Doors

Download file

08 83 00 – Mirrors

Download file

10 21 13 – Toilet Partitions

Download file

10 21 13.15 – Factory-Painted Steel Toilet Compartments

Download file

10 28 00 – Commercial Toilet and Bath Accessories

Download file

10 28 00.10 – Grab Bars

Download file

22 40 00 – Plumbing Fixtures

Download file

Attachment E – PACT Accessibility Design Checklist

Download file